"Ekibastuz GRES-2" JSC

"Ekibastuz GRES-2" JSC

Interest: 50%

gres2.kz

"Ekibastuz GRES-2" JSC is Kazakhstan energy company located in the Republic of Kazakhstan with installed capacity of 1000 MW.

In accordance with the Registry of securities holders as of December 14, 2019 registered ownership of JSC "Samruk-Kasyna" on 50% of shares of JSC "SEGRES-2".

Thus, the shareholders of SEGRES-2 JSC are: Samruk-Energy JSC (50%) and Samruk-Kazyna JSC (50%).

Ekibastuz GRES-2 has been designed with following main characteristics:

  • Installed capacity - 4,000 MW
  • Number of units – 8, 500 MW each
  • Fuel - high-ash coal of Ekibastuz coal basin

The first unit was commissioned in 1989. The second unit was put into operation in 1991.

The development of the plant was halted on the third unit at the stage of construction works. Part of the infrastructure has been fully completed (cooling pond, chemical water treatment station, startup boiler house, coal storage with the railway infrastructure, ash dump).

Characteristics of operating GRES-2

  • GRES-2 installed capacity is 1 000 MW, available - 934 MW
  • Power units No.1, 2 with turbine units K-500-240-4 LMZ + TVV-500 "Elektrosila" and boilers PP-1650-250-545 / 545 (P-57R) ZIO-Podolsk were put into operation in 1990 and 1993.
  • Construction of main building for power unit No.3 was completed by 70% in the period until 1993

The need and possibilities for further development of the plant 

There is an objective necessity and possibilities for construction of new power units at Ekibastuz GRES-2 site, since:

  • Operation of 2 units cannot ensure necessary security of supplies - because of this the power plant loses to competitors in terms of price.
  • Growing consumption of electricity even taking into account the reconstruction and expansion of existing plants will produce a supplementary demand of 3 000 MW by 2011.
  • Availability of ready infrastructure, the proximity of fuel sources will provide the project with competitive advantages over other potential projects on construction of generating facilities.

Technical solution – initially it was considered to expand the power plant by using CFB technology and tower type boilers).

CFB boilers are not produced in Russia, and their development will require indefinitely long time, boilers of foreign production with required capacity started only going through test runs and will also require considerable time to bind to characteristics of Ekibastuz coals.

The solution designed for the use of tower type boilers under real life conditions was much more time consuming and expensive than the boiler P-57R.

Both solutions - CFB boilers and tower type boilers - require disassembly of the roof of the existing building, which creates an open-air installation problem and seasonal constraints of operations and lead to the need to build a temporary partition between the 2nd and the 3rd units.

The analysis of advantages and disadvantages of various technical solutions options resulted in selection of the option with upgraded T-shaped boiler P-57R.

The expansion of GRES-2 by 500 MW unit No.3 with supercritical parameters was recommended in feasibility study. 

Composition and characteristics of No.3 unit’s main equipment:

  • Boiler - 1650t / h, 25 MPa, 545 C
  • Turbine K-500-240, 525 MW
  • Generator T3B-540-2U3, 540 MW

"Almaty Power Plants" JSC

"Almaty Power Plants" JSC

Interest: 100%

ales.kz

"Almaty Power Plants" JSC (“APP" JSC) is energy producing organization carrying out activity on production of heat and electricity in Almaty city and Almaty region. "APP" JSC supplies the population, industrial and agricultural enterprises with electricity and heat, and is a natural monopoly entity for the production of heat.

“APP” JSC was established by the decision of "KazTransGas" JSC No.92 dated 23.05.2006 and registered on 01.06.2006 under the state registration number of legal entity 78188-1910-AO. The company is now a part of  “Samruk-Energy” JSC group of companies. The organizational structure of "APP" JSC consists of 8 production units.

Production departments:

  • CHP-1 - production of electricity and heat;
  • CHP-2 - production of electricity and heat;
  • CHP-3 - production of electricity and heat;
  • Kapchagay HPP - production of electricity;
  • Cascade of hydropower plants - production of electricity;
  • Western Thermal Complex (WTC) - production of heat;
  • Production and Repair Company "Energoremont" (PRC) - repair of "APP" JSC equipment;
  • Center for receiving and discharging of fuel (CRDF) - reception and unloading of fuel for energy sources of "APP" JSC.

A shareholder of “APP” JSC is "Samruk-Energy" JSC - 100% of shares.

Almaty region is electricity and heat sale market for “APP” JSC  

In order to optimize the asset management structure of "Samruk-Energy" JSC, 100% of APP shares were transferred to direct management of the Company. Justification: The decision of “Samruk-Energy” JSC Board of Directors (Minutes No.77 dated September 9, 2013).

"Kazhydrotechnenergo" LLP

"Kazhydrotechnenergo" LLP

Interest: 100%

samruk-energy.kz

“Kazhydrotechenergo” LLP is a company engaged in development of seven small hydropower plants in southern Kazakhstan with total capacity of 108 MW.

A decision of the Board of Directors (Minutes No. 75) "On acquisition of 50% stake in the authorized capital of “Ekibastuz GRES-1” LLP and 100% stake in the authorized capital of “Kazhydrotechenergo” LLP by the Company” was received on July 4, 2013.

In the framework of direction "Social Responsibility" the environmental protection is a priority (implementation of "green economy" strategy), in this connection the acquisition of "Kazhydrotechenergo" LLP is one of  "Samruk-Energy" JSC priorities. The Partnership’s activity includes engineering, building facilities using renewable energy sources, independent technical devices and related to them facilities for production of electricity and (or) heat using renewable energy sources (projects - construction of seven small hydropower plants by Kazhydrotechenergo).

"Energia Semirechia” LLP

"Energia Semirechia” LLP

Ownership share: 25%

www.energy7.kz

Energiya Semirechya Limited Liability Partnership provides services for the production of electrical energy, design and construction of facilities using renewable energy sources.

Energiya Semirechya LLP is a joint Kazakh-Chinese venture, which was established to carry out activities in the construction of wind power plants (WPPs).

The participants of Energiya Semirechya LLP are currently Samruk-Energo JSC (share - 25%) and a number of Chinese companies that are part of the Power Construction Corporation of China Ltd. group: Hydrochina Corporation (share - 50%), Powerchina Chengdu Engineering Corporation Limited (share - 15%), Powerchina Resources Limited (share - 10%).

In 2022, Energiya Semirechya LLP completed the implementation of the investment project "Construction of a wind power plant in the Shelek corridor with a capacity of 60 MW with the prospect of expanding to 300 MW".

Location of the Project - Almaty region, Enbekshikazakh district, Shelek corridor, Nurly village.

JSC «Moynak hydropower plant named after U.D. Kantayev»

JSC «Moynak hydropower plant named after U.D. Kantayev»

Interest: 100%

moynak.kz

Moynak hydropower plant was commissioned in 2012. The complex of Moynak HPP facilities with regulated Bestubinsk reservoir is a waterworks facility with pressure intake system, located 150 km east of Almaty in the upper reaches of Charyn River.

The main purpose of Moynak HPP is to use HPP as maneuverable power source to cover peak loads in South Kazakhstan region

  • Installed capacity – 2X150 MW
  • Annual average output – 1027 mln.kWh
  • Parameters of Bestubinsk water reservoir
  • FSL – 1770 m
  • DSL– 1736 m
  • Full reservoir capacity at FSL: 238 mln. m3
  • Useful reservoir capacity– 198 mln. m3
  • Downstream elevation – 1242, 5m
  • Estimate discharge – 74, 0 m3/sec
  • Calculated head – 471, 4 m 

"AlmatyEnergoSbyt" LLP

"AlmatyEnergoSbyt" LLP

Interest: 100%

esalmaty.kz

"AlmatyEnergoSbyt" limited liability partnership (hereinafter – “AES” LLP) was established in June 2006 as a power supply company in accordance with the Law on Electricity.

The only participant of “AlmatyEnergoSbyt” LLP is "Samruk-Energy" JSC - 100% interest.

 "AES" LLP is the largest supplier of electricity on the territory of Kazakhstan, providing electricity to more than 3,5 million people and 38 thousand enterprises of Almaty city and Almaty region.

 Total users: 933 302

  • Individuals: 894 177
  • Legal entities: 39 125

 The main purpose of the Partnership is a reliable and stable supply of electricity to consumers of Almaty and eight administrative districts of Almaty region.

"AES" LLP is the entity of wholesale and retail electricity markets.

"Shardarinskaya HPP" JSC

"Shardarinskaya HPP" JSC

Interest: 100%

sharges.kz

Shardara hydroelectric power plant, located in  South Kazakhstan region is the last  dam of cascade of dams on Syrdarya River, which flows into the Aral Sea. The operating mode is mainly determined by releases from upstream reservoirs.

The purpose of hydraulic power system is comprehensive: irrigation, power generation, flood control, fishery, and water supply.

Impounding reservoir is designed for storage of winter runoff for irrigation.

A brief description

  • Commissioning - 1967.
  • Date of establishment - September 22, 1998
  • Installed capacity - 100 MW
  • Long-term annual average output - 377 million kW.
  • Number of units - 4
  • Headcount - 157 persons
  • Hydropower plant type – run-of-the-river
  • Purpose - irrigation, power generation, flood control.

Electricity generation:

"Shardarinskaya HPP" JSC generated a record volume in 2010 - 670 million kWh of electricity

At present the modernization of Shardarinskaya HPP project is underway. The main objectives of the project is replacement of obsolete and worn-out equipment, an increase in capacity of the power plant and power generation to meet the growing shortage of electricity in the region, improve reliability of equipment and reduce the power plant’s accidents risk level, improve the efficiency of the plant by reducing direct costs associated with repair and operational servicing of equipment.

Project implementation period:

  • 2010-2017

The effect of the project:

  • Increase in capacity of Shardarinskaya HPP up to 126 MW.
  • Production of additional 57 mln. KWh / annum

Jobs

  • During construction period, on average - 200 people.
  • During operation, on average - 185 people.

"Ust-Kamenogorskaya HPP"

"Ust-Kamenogorskaya HPP"

Interest: 89.99%

samruk-energy.kz

More than 40% of hydropower plants are concentrated in the east of the Republic of Kazakhstan on the Irtysh River. The first of Irtysh cascades- Ust-Kamenogorskaya Hydropower Plant is also known by the fact that for some time it was headed by Georgy Malenkov, the former Chairman of Soviet Union Council of Ministers.

Design and construction of the power plant began in 1939, but due to World War II first turbine was put into operation only in December 1952. Difficult post-war years lead to the fact that the power plant reached its design capacity only in 1959; the remaining three turbines were introduced in June 1953, December 1953 and November 1959, respectively.

Currently, the plant is located in the northeast suburb of Ust-Kamenogorsk, has four turbines (82,8 MW) with installed capacity of 331,2 MW.

The composition of hydropower facilities:

  • Concrete spillway dam with crest length 92 m, has four spillway openings;
  • Non-overflow concrete dam 300 m long;
  • Appurtenant structure 129 m long;
  • Single-chamber shipping lock.

The plant's installed capacity is 331,2 MW, but because of incomplete removal of cofferdam and design tail water level changed by 1,5 meters, available capacity is 315 MW.

Long-term annual average generation of the plant is 1 580 mln. kWh, and at low water year - 1200 mln. kWh.

"Alatau Zharyk Company" JSC

"Alatau Zharyk Company" JSC

Interest: 97,4%

azhk.kz

"Alatau Zharyk Company" JSC (hereinafter -  "AZhC" JSC) is one of major regional power grid companies in the south of the republic on transmission and distribution of electricity for population, industrial and agricultural enterprises in the area of ​​its operations -Almaty  city and Almaty region. The service area of "AZhC"  JSC geographically stretches from the shores of Balkhash Lake to the border with China.

Balance sheet inventory of "AZhC" JSC includes power grids with voltage type: 220-110-35-10-6-0,4 kV.

  • 220 kV overhead power transmission lines with length of 410,34 km;
  • 220 kV cable lines – 47,45 km;
  • 110 kV overhead power transmission lines with a total length of 2698 km;
  • 110 kV cable lines -206,36 km;
  • 35 kV power grids - overhead and cable lines with a total length of 2602,87 km;
  • 6-10 kV overhead and cable lines with a total length of 12 831,73 km;
  • 0, 4 kV power transmission lines with a total length of 11 805,62 km;

On the balance sheet of AZhK are:

  • 209 substations with voltage of 35 kV and above;
  • the number of 6-10 / 0,4 kV transformer substations is 6762 units
  • the number of transformers 6-220 kV - 8,474, with a total transformer capacity of 9 808,2 MVA.

LLP "Ekibastuz GRES-1"

LLP "Ekibastuz GRES-1"

Interest: 100%

gres1.kz

"Ekibastuz GRES-1" is condensing thermal power plant that generates and distributes electricity, with an installed capacity of 4,000 MW. The power plant’s main fuel is Ekibastuz coal deposit.

Today, five of the eight units are in constant operation and can develop 2500 MW. 

To date, three international standards ISO 9001: 2000, OHSAS 18001: 2007, ISO 14001: 2004 have been introduced and are working successfully in the company.  In December 2006, the power plant has received an international certificate of compliance with requirements of Quality Management System - ISO 9001: 2000. In March 2008, the power plant has received certificates according to Standard of Management System in the area of ​​occupational health and safety - OHSAS 18001 and Standard of Management System in the area of ​​environmental protection - ISO 14001: 2004.

Power unit No. 1 at EGRES-1 power plant are scheduled to be restored and upgraded by 2024; this will enable the plant to reach its nameplate capacity of 4000 MW and satisfy growing demand for electricity not only in Kazakhstan but also in neighboring countries. Recovery of non-operating facilities is economically feasible for Ekibastuz GRES-1 and necessary for Kazakhstan since it reduces power shortage risks in the country and contributes to the growth of national economy.