SAMRUK ENERGY

EFFICIENT HIGH-TECH
OPERATING ENERGY COMPANY

News

22.11.24

Samruk-Energy and Ansaldo Energia discuss prospects for cooperation

21.11.24

Head of Samruk-Energy welcomes participants of the IX Sports tournament

19.11.24

Samruk-Energy HR specialists successfully complete "C&B School" program

About company

"Samruk-Energy" JSC is the largest diversified electric power holding company with a primary objective of establishing a highly efficient energy supply system to support the sustainable development of all sectors in Kazakhstan. Its core operations encompass production of electricity and heat, transmission, distribution and sale of electricity, thermal coal mining. The Company is dedicated to implementing a cohesive state policy within the power industry. This commitment involves the modernization, reconstruction, and construction of power generation facilities. These efforts are aimed at bolstering Kazakhstan's energy security and ensuring a reliable energy supply for the nation's growth and development.

Blog Of The Chairman Of The Board

Dear visitors of the blog! I thank You for your interest in my personal blog. In turn, I will try to answer all your questions regarding the work of our Company or its subsidiaries and affiliates. I hope that our communication will help you form an objective opinion about Samruk-Energo JSC.

Go to the blog
blog pred

«Samruk-Energy» JSC investment projects

Group of companies

Central office

Generation companies

Distribution companies

HPP

RES

Coal companies

31.3%

from total electricity generation in Kazakhstan

30%

from the total installed capacity of stations in the unified energy system of the Republic of Kazakhstan

38.1%

from the volume of coal production in Kazakhstan

1 259 225

million tenge аssets

map

Useful links

The Project "Reconstruction of cable grids in Almaty"

The Project "Reconstruction of cable grids in Almaty"

 photo12 AJK podstanc

Project Purpose:

Reducing the level of wear and tear of power grids.

Reconstruction, modernisation and new construction in order to increase transformer capacity and cover the capacity deficit for new and existing consumers.

Reconstruction of power grids with replacement of overloaded and expired cable networks not requiring connection of new consumers in order to increase reliability of power supply and reduce technological failures.

Description of the project:

The total number of 10-6-0.4kV cable lines across Almaty is 4,424 km. According to GOST, the service life of power cables is 30 years.

Currently, 2,478.76 kilometres of 10-6-0.4kV cable lines in Almaty or 56% of the total volume of cable lines have service life of more than 30 years.

In general, 948 kilometres of cable lines in Almaty have service life over 50 years.

Worn-out lines lead to an annual increase in the number of accidents and frequent interruptions in power supply, which leads to under-supply of electricity and additional costs for emergency recovery work. The main causes of damage are ageing of insulation, breach of tightness, corrosive deterioration of cable sheathing.

Within the framework of this project it is planned to carry out measures on reconstruction of cable networks 10-6-0,4kV for the total amount of 83 300 000 thousand tenge excluding VAT with the total volume of reconstruction of networks about 933 km.

Status:

Construction and installation works are being carried out on 11 objects having DED with the length of 267 km.   Adjustment of the design and construction plans for 4 objects is underway.

Implementation terms: 2022-2030.

Operation: 2024-2030.

Planned activities:

Phased design and construction and installation works 2023-2030.